John Sherwin Steel Renewal

Post a reply

Confirmation code
Enter the code exactly as it appears. All letters are case insensitive.
Smilies
:D :) ;) :( :o :shock: :? 8-) :lol: :x :P :oops: :cry: :evil: :twisted: :roll: :!: :?: :idea: :arrow: :| :mrgreen: :geek: :ugeek:

BBCode is ON
[img] is ON
[flash] is ON
[url] is ON
Smilies are ON

Topic review
   

Expand view Topic review: John Sherwin Steel Renewal

John Sherwin Steel Renewal

by Brian Bernard » Wed Apr 20, 2022 2:55 pm

This is a screen capture from the ABS record in regards to the steel renewal required for the John Sherwin. The worst affected steel plating is in the "G" Strake. Most is the other pitting would be repaired by welding.

Top